Bubble drilling method
Patent obtained and NETIS registered! A ground continuous wall construction method that can reduce the amount of generated excavated soil.
The "Bubble Excavation Method" is a continuous underground wall construction technique that uses bubble liquid to mix and stir with in-situ soil, stabilizing the excavation trench with the formed bubble-stable liquid. This method significantly reduces the amount of excavated soil by eliminating bubbles during wall construction compared to conventional bentonite-based stabilizing liquids, enabling the construction of high-quality continuous walls with high strength and water impermeability. 【Features】 ■ Reduction of generated mud volume (approximately 40-60% of excavation volume) is possible ■ Improved water impermeability ■ Fine bubbles enhance the water-stopping ability of the wall ■ Reduced machine load due to decreased viscosity of the excavation liquid ■ Easy reuse of residual soil For more details, please refer to the catalog or feel free to contact us.
- 企業:太洋基礎工業
- 価格:Other